1st corner poured today

 

 

 

 

 

 

 

Pouring the mud

 

 

 

 

 

 

 

 

 

 

 

Catching a ride down since you can walk anywhere on the second floor anymore until the mud dries

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The Food Bank has stairs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Checking up on Ralph

 

 

 

 

 

 

 

 

 

 

 

 

Electricians spooling wire

 

FB 2-06-06

The first trucked backed in at 9:00 this morning

Getting ready

A third of the second floor is done

So many stages - pour, rake, power trowel, hand trowel, fill in the holes, finish

By 1:00 Keegan was cleaning the power trowel

The finishers are using the Snorkel lift to hold them up as they finish the edges of the second story

Freshly poured

The stairs are filled in

Meanwhile, the carpenters are hard at work

Brian is making forms for the top of the IAC building

Outside, Star Electric is running wire to the addition

Feeding wire through the conduit - good thing it is so warm out (33 above 0 - snow is actually melting off roofs) and we will get 7 hours and 32 minutes of daylight today, too!

<= Back Next =>

IAC Photos RCPC photos

 

 

 

 

 

 

 

 

 

 

 

 

Dave running the hose

 

 

 

 

 

 

 

 

 

 

 

 

Finishers hard at work

 

 

 

 

 

 

 

 

 

 

 

Mr. Willie is here for every pour

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Here is a form Brian is building

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ralph is up top measuring distances

 

 

 

 

 

 

 

 

 

 

 

 

 

 