Fairbanks says "Thank you Dennis & Mary Wise!!"

Home / Past Projects / Current Projects / Daily Photos / Awards / Sponsors

Looking from the second floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

 

 

Hawken - back welding

 

 

 

 

 

 

 

 

 

 

 

 

 

Tri-tone

 

 

 

 

 

 

Glenn is drilling a hole in the ground floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

IAC 7-7-05

We have a ceiling over part of the first floor!

The ultimate sign of high class - the boys have brought their picnic tables inside the new building to keep themselves out of the rain and hot sun

In the background you can see the block walls from the second story landing

That's a lot of steel

Ryan is cranking the pandecking trying to get one more inch out of it

The carpenter's stairwell

Getting higher and higher & longer and longer


Glenn, our electrician

Glenn is drilling holes in the floor for electrical wires to be pulled through

In the crawl space the electricians are running their conduit

 

Outside, Star Electric has left their mark, as well. These pipes are the other end of the ones you just saw in the crawl space

<= Back Next =>

Food Bank photos

 

 

The columns are getting shorter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Paul spent much of his day with a water pump bilging out the basement

 

 

 

 

 

Glenn's hole

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

anne@wiseprojects.org © 2005