Bolted into place

 

 

 

 

 

 

Ryan moves the steel from the yard to where the crane is

 

 

 

 

 

 

 

Glenn goes ahead of the guys handling the steel to clear out the beam pockets

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hawken is still welding preparing for a second floor concrete pour

 

IAC 7-12-05

Paul is guiding the steel into the building

If you look up through the steel you can see the crane

Ryan, at the far end of the steel, is putting the joist into position for the crane

Dave unties the crane hook

This spud wrench is used to line up the holes so the bolts can go into place

<= Back Next =>

Food Bank photos

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Garage steel is set

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ivar is preparing to build the stairs for the second floor

 

 

 

 

 

 

 

Inside the building the electricians are still working away inserting conduit into Glenn's holes

 